    (A) Building Permits.

    Building (Total Valuation)

      $1,000.00 and less .....$40.00 

      $1,001.00 to $50,000.00 .....40.00*

      $50,001.00 to $100,000.00 .....250.00*

      $100,001.00 to $500,000.00 .....500.00*

      $500,001.00 and greater .....1,500.00*

        * Plus $5.00 for each additional $1,000.00 or fraction thereof

    Demolition

      0 to 100,000 cu. ft. .....$100.00

      100,001 cu. ft. and over .....200.00

    Fences

      Fence .....$40.00

      $25.00 for first $1,000.00 plus $5.00 for each additional $1,000 or fraction thereof.

    Moving

      Any building or structure .....$200.00

    Roofing

      Roofing .....$40.00

      $25.00 for first $1,000.00 plus $5.00 for each additional $1,000.00 or fraction thereof.

    Sidewalk and approach

      Sidewalk and approach .....$40.00

      $25.00 for first $1,000.00 plus $5.00 for each additional $1,000.00 or fraction thereof.

    Signs

      Portable/temporary .....$40.00

      Permanent .....$50.00

    Storage

      Accessory building (minimum of 120 sq. ft.) .....$25.00

    Swimming Pool

      Building .....$50.00

      Electrical .....$45.00

      Plumbing .....$45.00

       Base permit is $130.00 for the first $1,000.00 plus $5.00 for each additional $1,000.00 or fraction thereof.

    (B) Electrical Permits.

    Electrical Permits

      Electrical permits .....$40.00

      $25.00 for first $1,000.00 plus $5.00 for each additional $1,000.00 or fraction thereof.

    Electrical Services; Registration of Persons Performing

      Initial registration .....$50.00

      Annual renewal .....25.00

    (C) Gas Inspection.

    Gas Inspection

      Rough-in piping .....$40.00

      Final piping and connections .....40.00

      All other inspections (per inspection) .....40.00

    (D) Irrigation.

    Irrigation

      Irrigation .....$40.00

      $25.00 for first $1,000.00 plus $5.00 for each additional $1,000.00 or fraction thereof.

    Irrigation Services; Registration of Persons Performing

      Initial registration .....$50.00

      Annual renewal .....25.00

    (E) Mechanical Permits.

    Mechanical Permits

      Mechanical permits .....$40.00

      $25.00 for first $1,000.00 plus $5.00 for each additional $1,000.00 or fraction thereof.

    Mechanical Services; Registration of Persons Performing

      Initial registration .....$50.00

      Annual renewal .....25.00

    (F) Plumbing Permits.

    Plumbing Permits

      Plumbing permit .....$40.00

      $25.00 for first $1,000.00 plus $5.00 for each additional $1,000.00 or fraction thereof.

    Plumbing Services; Registration of Persons Performing

      Initial registration .....$50.00

      Annual renewal .....25.00

    (G) Planning and Zoning Fees.

    Planning and Zoning Fees

      Application .....$200.00

      Conditional Use .....200.00

      Special Use .....200.00

      Variance .....200.00

      Certificate of Occupancy .....50.00

(Ord. 9-12-96, passed 9-24-96; Am. Ord. 9-13-99, passed 9-28-99; Am. Ord. 0-07-03, passed 7-22-03; Am Ord. O-05-08, passed 3-11-08)